Capitol Complex Shutdown Events Calendar*

SunMonTueWedThuFriSat
1
Dr. Bob Glaze Lab (DBGL)
DSI DW Flood Control Valve Installation (03/01 - 03/01)
Dr. Bob Glaze Lab (DBGL)
DSI RO Control Valve Installation (03/01 - 03/01)
2
Parking Garage R (PKR)
External LED Indicator Installation (03/02 - 03/20)
Park 35 Bldg. B (P35B)
P35-B Remediation (03/02 - 04/17)
North Austin Complex (NACA)
Semi Annual Fire Sprinkler System Inspections (03/02 - 03/03)
DSHS F Building (DHF)
BP8 Reroofs of Bldgs. F,G,K & DHNP (03/02 - 03/06)
3
Dr. Bob Glaze Lab (DBGL)
DSI HWP (11/03 - 11/07)
Stephen F Austin Building (SFA)
Remove SFA CHWP 2 for Repairs (03/03 - 03/06)
4
Parking Garage T (PKT)
Semi Annual Fire Sprinkler System Inspections (03/04 - 03/05)
Parking Garage T (PKT)
Building Co Calibration (03/04 - 03/04)
5
6
William B Travis Building (WBT)
7th Floor CHR Abatement (03/06 - 03/08)
7
John H. Winters Building (JHW)
Building Fire Alarm System (output testing) (03/07 - 03/07)
North Congress State Building(NCSB)
15th St Duct Bank installation for NCSB project (03/07 - 03/08)
Dr. Bob Glaze Lab (DBGL)
DSI L1 CHW Insulation Repair (03/07 - 03/08)
8
9
DSHS F Building (DHF)
BP8 Reroofs of Bldgs. F,G,K & DHNP (03/09 - 03/13)
10
Texas School for the Deaf
Annual Elevator Inspections (10/10 - 10/10)
Tom C Clark Building
Fire Suppression Annual Inspection (10/10 - 10/10)
William B Travis Building (WBT)
Connect 1SX circuit (03/10 - 03/10)
11
12
13
14
Central Power Plant (CPP)
CPP Steam Shutdown (3-14-2026, Saturday) (03/14 - 03/14)
North Congress State Building(NCSB)
15th St Duct Bank installation for NCSB project (03/14 - 03/15)
15
Brown Heatly Building (BHB)
3rd floor panel 3DPA shutdown (02/15 - 02/15)
16
Lyndon B Johnson Building (LBJ)
LBJ Granite Facade Repair (03/16 - 03/20)
17
William P Clements Building (WPC)
WPC elevator 5 maintenance (03/17 - 03/18)
Texas School for the Deaf (TSD)
Semiannual Fire Sprinkler Inspections (03/17 - 03/19)
18
19
Tom C Clark Building (TCC)
PDB/TCC/SCB Panel change out shutdown. (12/19 - 12/24)
20
William B Travis Building
7th Floor Commissioners Room Renovation (10/20 - 11/20)
Park 35 Bldg. A (P35A)
Restripe (03/20 - 03/22)
21
Park 35 Bldg. A (P35A)
P35A CHW Valve Replacement (03/21 - 03/21)
22
Human Services Warehouse
Annual Elevator Inspections (10/22 - 10/22)
23
Central Utility Plant Expansion (CUPX)
Building Fire Alarm System (03/23 - 03/23)
Central Utility Plant Expansion (CUPX)
Building Fire Alarm System (03/23 - 03/23)
Insurance Warehouse (INW)
INW Parking Lot Striping (03/23 - 03/27)
24
25
26
27
28
29
30
31
Notice Type Legend:
Other
Construction Work
Traffic / Special Event
Maintenance Services
Shutdown
Emergency Repair


*Note: Only Shows start date. Use Day view for all projects on a given date.