Capitol Complex Shutdown Events Calendar*

SunMonTueWedThuFriSat
1
Dr. Bob Glaze Lab (DBGL)
DSI DW Flood Control Valve Installation (03/01 - 03/01)
Dr. Bob Glaze Lab (DBGL)
DSI RO Control Valve Installation (03/01 - 03/01)
2
Parking Garage R (PKR)
External LED Indicator Installation (03/02 - 03/20)
Park 35 Bldg. B (P35B)
P35-B Remediation (03/02 - 04/17)
North Austin Complex (NACA)
Semi Annual Fire Sprinkler System Inspections (03/02 - 03/03)
DSHS F Building (DHF)
BP8 Reroofs of Bldgs. F,G,K & DHNP (03/02 - 03/06)
Robert D. Moreton Building (RDM)
Building Fire Alarm System Input Devices (03/02 - 03/03)
3
Dr. Bob Glaze Lab (DBGL)
DSI HWP (11/03 - 11/07)
Stephen F Austin Building (SFA)
Remove SFA CHWP 2 for Repairs (03/03 - 03/06)
4
Parking Garage T (PKT)
Semi Annual Fire Sprinkler System Inspections (03/04 - 03/05)
Parking Garage T (PKT)
Building Co Calibration (03/04 - 03/04)
5
6
William B Travis Building (WBT)
7th Floor CHR Abatement (03/06 - 03/08)
Dr. Bob Glaze Lab (DBGL)
DSI - AHU-1 and LEU-2 Actuator Replacement (03/06 - 03/08)
7
John H. Winters Building (JHW)
Building Fire Alarm System (output testing) (03/07 - 03/07)
North Congress State Building(NCSB)
15th St Duct Bank installation for NCSB project (03/07 - 03/08)
Dr. Bob Glaze Lab (DBGL)
DSI L1 CHW Insulation Repair (03/07 - 03/08)
Robert D. Moreton Building (RDM)
Building Fire Alarm System Output Devices (03/07 - 03/07)
8
9
Stephen F Austin Building (SFA)
SFA 800-860 Renovation (03/09 - 04/20)
DSHS F Building (DHF)
BP8 Reroofs of Bldgs. F,G,K & DHNP (03/09 - 03/13)
10
Texas School for the Deaf
Annual Elevator Inspections (10/10 - 10/10)
Tom C Clark Building
Fire Suppression Annual Inspection (10/10 - 10/10)
William B Travis Building (WBT)
2NL Panel Shutdown (03/10 - 03/10)
William B Travis Building (WBT)
Connect 1SX circuit (03/10 - 03/10)
11
Promontory Point (PROM)
Building Fire Alarm System Input Devices (03/11 - 03/11)
Promontory Point (PROM)
Building Fire Alarm System Output Devices (03/11 - 03/11)
12
North Austin Complex (NACA)
Building Fire Alarm System Input Devices (03/12 - 03/12)
DSHS F Building (DHF)
HWP Compressor Change-out (03/12 - 03/13)
13
14
North Austin Complex (NACA)
Building Fire Alarm System Output Devices (03/14 - 03/14)
North Congress State Building(NCSB)
15th St Duct Bank installation for NCSB project (03/14 - 03/15)
Human Services Warehouse (HSW)
HSW DF Replacement (03/14 - 03/14)
15
Brown Heatly Building (BHB)
3rd floor panel 3DPA shutdown (02/15 - 02/15)
16
Lyndon B Johnson Building (LBJ)
LBJ Granite Facade Repair (03/16 - 03/20)
Stephen F Austin Building (SFA)
SFA 730 Suite Renovation (03/16 - 05/01)
Texas School for the Blind and Visually Impaired (TSBVI)
Semiannual Fire Sprinkler Inspections (03/16 - 03/16)
DSHS F Building (DHF)
BP8 Reroofs of Bldgs. F,G,K & DHNP (03/16 - 03/20)
DSHS New Power Plant (DHNP)
Hot Work Permit (Old DHNP Roof) (03/16 - 03/20)
James Earl Rudder Building (JER)
JE Rudder Building Renovation Project (03/16 - 12/08)
17
William P Clements Building (WPC)
WPC elevator 5 maintenance (03/17 - 03/18)
Texas School for the Deaf (TSD)
Semiannual Fire Sprinkler Inspections (03/17 - 03/19)
North Austin Complex (NACA)
NACA 7th Floor Renovation (03/17 - 04/24)
18
19
Tom C Clark Building (TCC)
PDB/TCC/SCB Panel change out shutdown. (12/19 - 12/24)
Human Services Warehouse (HSW)
Building Fire Alarm System (03/19 - 03/19)
Brown Heatly Building (BHB)
BHB PDU replacement and Electrical upgrade (03/19 - 03/19)
20
William B Travis Building
7th Floor Commissioners Room Renovation (10/20 - 11/20)
Park 35 Bldg. A (P35A)
Restripe (03/20 - 03/22)
Stephen F Austin Building (SFA)
SFA 1003 Suite Renovation (03/20 - 03/22)
Stephen F Austin Building (SFA)
SFA 730 Concrete Coring Project (03/20 - 03/22)
Stephen F Austin Building (SFA)
SFA 800-860 - GPT Scan and Coring (03/20 - 03/22)
John H. Winters Building (JHW)
Flooring Replacement 1st Floor Vestibules (03/20 - 03/21)
21
Central Power Plant (CPP)
CPP Steam Shutdown (3-14-2026, Saturday) (03/21 - 03/21)
Park 35 Bldg. A (P35A)
P35A CHW Valve Replacement (03/21 - 03/21)
Park 35 Bldg. A (P35A)
P35A CHW Valve Replacement (03/21 - 03/21)
Human Services Warehouse (HSW)
Building Fire Alarm System (03/21 - 03/21)
DSHS Records Building (DHR)
Building Fire Alarm System (03/21 - 03/21)
Tom C Clark Building (TCC)
SCB-TCC-PDB Electrical Trace/Power breaker testing (03/21 - 03/21)
22
Human Services Warehouse
Annual Elevator Inspections (10/22 - 10/22)
23
Stephen F Austin Building (SFA)
SFA 1003 Suite Renovation (03/23 - 05/08)
Central Utility Plant Expansion (CUPX)
Building Fire Alarm System (03/23 - 03/23)
Central Utility Plant Expansion (CUPX)
Building Fire Alarm System (03/23 - 03/23)
24
John H. Winters Building (JHW)
Annual Elevator Inspections (03/24 - 03/24)
Parking Garage Q (PKQ)
Building Fire Alarm System (03/24 - 03/24)
Parking Garage Q (PKQ)
Building Fire Alarm System (03/24 - 03/24)
Other
Phase 2 water line FULL shut out for tie ins (03/24 - 03/25)
25
Parking Garage E (PKE)
Building Fire Alarm System Input & Output devices (03/25 - 03/25)
Parking Garage F (PKF)
Building Fire Alarm System Input & Output devices (03/25 - 03/25)
Parking Garage G (PKG)
Building Fire Alarm System Input & Output devices (03/25 - 03/25)
Central Services Building (CSB)
Patch, repaint corridors (03/25 - 03/30)
26
Parking Garage R (PKR)
PKR - Panel P2 Electrical Tie In (03/26 - 03/26)
DSHS New Power Plant (DHNP)
BP8 Reroofs of Bldgs. F,G,K & DHNP (03/26 - 04/02)
27
Barbara Jordan Building (BJB)
FY26 BJB Ceiling Repair (03/27 - 03/29)
Other
Functional testing (03/27 - 03/28)
28
North Congress State Building(NCSB)
15th St Duct Bank installation for NCSB project (03/28 - 03/29)
29
30
Insurance Warehouse (INW)
INW Parking Lot Striping (03/30 - 04/02)
William B Travis Building (WBT)
Ground floor G.000.1 Entry Closure notification (03/30 - 04/03)
DSHS F Building (DHF)
DHF F121 Build Temporary Wall (03/30 - 04/10)
31
Parking Garage P Plant (PKPP)
TFC Ph VI Energy Conservation Project CT Meter (03/31 - 04/02)
North Austin Complex (NACA)
NACA 7th Floor Renovation Fire Alarm Work (03/31 - 04/02)
North Austin Complex (NACA)
NACA 7th Floor Renovation Fire Sprinkler Work (03/31 - 04/02)
Parking Garage R (PKR)
PKR - Paint at Level 1 NE Elevator Lobby Door (03/31 - 03/31)
Promontory Point (PROM)
Promp Dock Leveler Install (03/31 - 04/01)
Notice Type Legend:
Other
Construction Work
Traffic / Special Event
Maintenance Services
Shutdown
Emergency Repair


*Note: Only Shows start date. Use Day view for all projects on a given date.