Dr. Bob Glaze Lab (DBGL)
DSI DW Flood Control Valve Installation (03/01 - 03/01)
Building: Dr. Bob Glaze Lab (DBGL)
Location / Room: 1st Floor Mechanical Room Start Date: 03/01/2026 Start Time: 6:00 am End Date: 03/01/2026 End Time: 6:00 pm Work Type: Domestic water Tfc Event: yes Project Owner: Ronald Lunsford TFC Project Num: 20-013-5485/20-013-2519 TFC WorkOrder Num: na
Dr. Bob Glaze Lab (DBGL)
DSI RO Control Valve Installation (03/01 - 03/01)
Building: Dr. Bob Glaze Lab (DBGL)
Location / Room: Roof Start Date: 03/01/2026 Start Time: 6:00 am End Date: 03/01/2026 End Time: 6:00 pm Work Type: Installation work Tfc Event: yes Project Owner: Ronald Lunsford TFC Project Num: 20-013-5485/20-013-2519 TFC WorkOrder Num: na |
2
Parking Garage R (PKR)
External LED Indicator Installation (03/02 - 03/20)
Building: Parking Garage R (PKR)
Location / Room: Garage Levels 1-3 (one level per week) Start Date: 03/02/2026 Start Time: 6:00am End Date: 03/20/2026 End Time: 6:00pm Work Type: Electrical Tfc Event: No Project Owner: Marcus Davis TFC Project Num: 20-014-5900 TFC WorkOrder Num: Na
Park 35 Bldg. B (P35B)
P35-B Remediation (03/02 - 04/17)
Building: Park 35 Bldg. B (P35B)
Location / Room: 1st floor hallway,1001,1002,1003,1004,224, 1st floor water lab Start Date: 03/02/2026 Start Time: 9:00 AM End Date: 04/17/2026 End Time: 5:00 PM Work Type: Demolition work Tfc Event: yes Project Owner: Anthony Rogers TFC Project Num: 26-8114 TFC WorkOrder Num: Na
North Austin Complex (NACA)
Semi Annual Fire Sprinkler System Inspections (03/02 - 03/03)
Building: North Austin Complex (NACA)
Location / Room: Riser Rooms and Building Start Date: 03/02/2026 Start Time: 8:00 am End Date: 03/03/2026 End Time: 4:00 pm Work Type: Fire Sprinklers Water Tfc Event: yes Project Owner: Christian L. Guerra TFC Project Num: N/A TFC WorkOrder Num: N/A
DSHS F Building (DHF)
BP8 Reroofs of Bldgs. F,G,K & DHNP (03/02 - 03/06)
Building: DSHS F Building (DHF)
Location / Room: Bldg F Roof Start Date: 03/02/2026 Start Time: 6:00 am End Date: 03/06/2026 End Time: 4:00 pm Work Type: Hot Work Permit (3 days required) Tfc Event: No Project Owner: Ronald Lunsford TFC Project Num: DM 20-013-5485 & 2519 TFC WorkOrder Num: na
Robert D. Moreton Building (RDM)
Building Fire Alarm System Input Devices (03/02 - 03/03)
Building: Robert D. Moreton Building (RDM)
Location / Room: Whole Building Start Date: 03/02/2026 Start Time: 7:00 End Date: 03/03/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: Na TFC WorkOrder Num: Na |
3
Dr. Bob Glaze Lab (DBGL)
DSI HWP (11/03 - 11/07)
Building: Dr. Bob Glaze Lab (DBGL)
Location / Room: 1st Floor Mechanical Room Start Date: 11/03/2025 Start Time: 0600 End Date: 11/07/2025 End Time: 1400 Work Type: Hot Work Permit (3 days required) Tfc Event: No Project Owner: Ronald Lunsford TFC Project Num: 20-013-5485/20-013-2519 TFC WorkOrder Num: na
Stephen F Austin Building (SFA)
Remove SFA CHWP 2 for Repairs (03/03 - 03/06)
Building: Stephen F Austin Building (SFA)
Location / Room: Chiller Plant Sub-Basement Start Date: 03/03/2026 Start Time: 7:30 AM End Date: 03/06/2026 End Time: 3:00 pm Work Type: Hot Work Permit (3 days required) Tfc Event: yes Project Owner: Deano Alvarado TFC Project Num: TFC WorkOrder Num: 2601823 |
4
Parking Garage T (PKT)
Semi Annual Fire Sprinkler System Inspections (03/04 - 03/05)
Building: Parking Garage T (PKT)
Location / Room: Riser Rooms and Building Start Date: 03/04/2026 Start Time: 7:00 am End Date: 03/05/2026 End Time: 3:00 pm Work Type: Fire Sprinklers Water Tfc Event: yes Project Owner: Christian L. Guerra TFC Project Num: N/A TFC WorkOrder Num: N/A
Parking Garage T (PKT)
Building Co Calibration (03/04 - 03/04)
Building: Parking Garage T (PKT)
Location / Room: Whole Building Start Date: 03/04/2026 Start Time: 7:00 End Date: 03/04/2026 End Time: 17:00 Work Type: Other Tfc Event: No Project Owner: Tony Barrientos TFC Project Num: TFC WorkOrder Num: |
5 |
6
William B Travis Building (WBT)
7th Floor CHR Abatement (03/06 - 03/08)
Building: William B Travis Building (WBT)
Location / Room: WBT 7th Floor Commissioners Hearing Room Start Date: 03/06/2026 Start Time: 5:00pm End Date: 03/08/2026 End Time: 8:00pm Work Type: Noise Notice – Daytime Tfc Event: No Project Owner: Tremaine Wingfield TFC Project Num: 993474 TFC WorkOrder Num: 993474
Dr. Bob Glaze Lab (DBGL)
DSI - AHU-1 and LEU-2 Actuator Replacement (03/06 - 03/08)
Building: Dr. Bob Glaze Lab (DBGL)
Location / Room: Roof Start Date: 03/06/2026 Start Time: 6:00 pm End Date: 03/08/2026 End Time: 2:00 pm Work Type: Cooling System Tfc Event: yes Project Owner: Ronald Lunsford TFC Project Num: 20-013-5485/20-013-2519 TFC WorkOrder Num: na |
7
John H. Winters Building (JHW)
Building Fire Alarm System (output testing) (03/07 - 03/07)
Building: John H. Winters Building (JHW)
Location / Room: Whole Building Start Date: 03/07/2026 Start Time: 7:00 End Date: 03/07/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: Na TFC WorkOrder Num: Na
North Congress State Building(NCSB)
15th St Duct Bank installation for NCSB project (03/07 - 03/08)
Building: North Congress State Building(NCSB)
Location / Room: 15th St between Colorado and Congress Start Date: 03/07/2026 Start Time: 7:00am End Date: 03/08/2026 End Time: 7:00pm Work Type: Traffic Lane closures Tfc Event: yes Project Owner: Cheryl Taylor TFC Project Num: 20-028-8011 TFC WorkOrder Num:
Dr. Bob Glaze Lab (DBGL)
DSI L1 CHW Insulation Repair (03/07 - 03/08)
Building: Dr. Bob Glaze Lab (DBGL)
Location / Room: Level 1 Start Date: 03/07/2026 Start Time: 05:00 End Date: 03/08/2026 End Time: 18:00 Work Type: Cooling System Tfc Event: yes Project Owner: Ronald Lunsford TFC Project Num: 20-013-5485/20-013-2519 TFC WorkOrder Num: na
Robert D. Moreton Building (RDM)
Building Fire Alarm System Output Devices (03/07 - 03/07)
Building: Robert D. Moreton Building (RDM)
Location / Room: Whole Building Start Date: 03/07/2026 Start Time: 7:00 End Date: 03/07/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: Na TFC WorkOrder Num: Na |
|
8 |
9
Stephen F Austin Building (SFA)
SFA 800-860 Renovation (03/09 - 04/20)
Building: Stephen F Austin Building (SFA)
Location / Room: SFA Suite 800-860 Start Date: 03/09/2026 Start Time: 6:30am End Date: 04/20/2026 End Time: 5:30pm Work Type: Noise Notice – Daytime Tfc Event: No Project Owner: Tremaine Wingfield TFC Project Num: 994857 TFC WorkOrder Num: 994857
DSHS F Building (DHF)
BP8 Reroofs of Bldgs. F,G,K & DHNP (03/09 - 03/13)
Building: DSHS F Building (DHF)
Location / Room: Bldg F Roof Start Date: 03/09/2026 Start Time: 6:00 am End Date: 03/13/2026 End Time: 4:00 pm Work Type: Hot Work Permit (3 days required) Tfc Event: No Project Owner: Ronald Lunsford TFC Project Num: DM 20-013-5485 & 2519 TFC WorkOrder Num: na |
10
Texas School for the Deaf
Annual Elevator Inspections (10/10 - 10/10)
Building: Texas School for the Deaf
Location / Room: Elevators Start Date: 10/10/2025 Start Time: 7:00 am End Date: 10/10/2025 End Time: 4:00 pm Work Type: Elevators Tfc Event: yes Project Owner: James Wooley TFC Project Num: N/A TFC WorkOrder Num: N/A
Tom C Clark Building
Fire Suppression Annual Inspection (10/10 - 10/10)
Building: Tom C Clark Building
Location / Room: 7th floor room 738 Start Date: 10/10/2025 Start Time: 9:00 AM End Date: 10/10/2025 End Time: 10:00 am Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: NA TFC WorkOrder Num: NA
William B Travis Building (WBT)
2NL Panel Shutdown (03/10 - 03/10)
Building: William B Travis Building (WBT)
Location / Room: 2E Start Date: 03/10/2026 Start Time: 6:30 End Date: 03/10/2026 End Time: 14:00 Work Type: Electrical Tfc Event: No Project Owner: Jason Nezamabadi TFC Project Num: 24-003-4202 TFC WorkOrder Num: Na
William B Travis Building (WBT)
Connect 1SX circuit (03/10 - 03/10)
Building: William B Travis Building (WBT)
Location / Room: 1ME Start Date: 03/10/2026 Start Time: 7:00 am End Date: 03/10/2026 End Time: 7:15 am Work Type: Electrical Tfc Event: No Project Owner: Jason Nezamabadi TFC Project Num: 24-003-4202 TFC WorkOrder Num: Na |
11
Promontory Point (PROM)
Building Fire Alarm System Input Devices (03/11 - 03/11)
Building: Promontory Point (PROM)
Location / Room: TPWC Whole Building Start Date: 03/11/2026 Start Time: 7:00 End Date: 03/11/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: Na TFC WorkOrder Num: Na
Promontory Point (PROM)
Building Fire Alarm System Output Devices (03/11 - 03/11)
Building: Promontory Point (PROM)
Location / Room: TPWC Whole Building Start Date: 03/11/2026 Start Time: 7:00 End Date: 03/11/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: Na TFC WorkOrder Num: Na |
12
North Austin Complex (NACA)
Building Fire Alarm System Input Devices (03/12 - 03/12)
Building: North Austin Complex (NACA)
Location / Room: Whole Building Start Date: 03/12/2026 Start Time: 7:00 End Date: 03/12/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: NA TFC WorkOrder Num: NA
DSHS F Building (DHF)
HWP Compressor Change-out (03/12 - 03/13)
Building: DSHS F Building (DHF)
Location / Room: Building F - Room F112.3 Start Date: 03/12/2026 Start Time: 9:00 am End Date: 03/13/2026 End Time: 4:00 pm Work Type: Electrical Tfc Event: No Project Owner: Kevin Sandberg TFC Project Num: 20-017-5610 TFC WorkOrder Num: N/A |
13 |
14
North Austin Complex (NACA)
Building Fire Alarm System Output Devices (03/14 - 03/14)
Building: North Austin Complex (NACA)
Location / Room: Whole Building Start Date: 03/14/2026 Start Time: 7:00 End Date: 03/14/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: Na TFC WorkOrder Num: Na
North Congress State Building(NCSB)
15th St Duct Bank installation for NCSB project (03/14 - 03/15)
Building: North Congress State Building(NCSB)
Location / Room: 15th St between Colorado and Congress Start Date: 03/14/2026 Start Time: 7:00am End Date: 03/15/2026 End Time: 7:00pm Work Type: Traffic Lane closures Tfc Event: yes Project Owner: Cheryl Taylor TFC Project Num: 20-028-8011 TFC WorkOrder Num:
Human Services Warehouse (HSW)
HSW DF Replacement (03/14 - 03/14)
Building: Human Services Warehouse (HSW)
Location / Room: Start Date: 03/14/2026 Start Time: 7:00 AM End Date: 03/14/2026 End Time: 3:00 PM Work Type: Domestic water Tfc Event: yes Project Owner: Isabel Camarillo TFC Project Num: TFC WorkOrder Num: 2602070 |
|
15
Brown Heatly Building (BHB)
3rd floor panel 3DPA shutdown (02/15 - 02/15)
Building: Brown Heatly Building (BHB)
Location / Room: 3rd floor Electrical room Start Date: 02/15/2026 Start Time: 7:00 AM End Date: 02/15/2026 End Time: 11:30 am Work Type: Electrical Tfc Event: yes Project Owner: Juan Gonzalez TFC Project Num: PR 27432 TFC WorkOrder Num: WO 930675 |
16
Lyndon B Johnson Building (LBJ)
LBJ Granite Facade Repair (03/16 - 03/20)
Building: Lyndon B Johnson Building (LBJ)
Location / Room: Start Date: 03/16/2026 Start Time: 8:00 am End Date: 03/20/2026 End Time: 5:00 pm Work Type: Hot Work Permit (3 days required) Tfc Event: yes Project Owner: Benjamin Barron TFC Project Num: 26-0000604 TFC WorkOrder Num: 859072
Stephen F Austin Building (SFA)
SFA 730 Suite Renovation (03/16 - 05/01)
Building: Stephen F Austin Building (SFA)
Location / Room: SFA 730 Start Date: 03/16/2026 Start Time: 6:30am End Date: 05/01/2026 End Time: 5:30pm Work Type: Noise Notice – Daytime Tfc Event: No Project Owner: Tremaine Wingfield TFC Project Num: 993398 TFC WorkOrder Num: 993398
Texas School for the Blind and Visually Impaired (TSBVI)
Semiannual Fire Sprinkler Inspections (03/16 - 03/16)
Building: Texas School for the Blind and Visually Impaired (TSBVI)
Location / Room: All rooms; including riser rooms, attics, and basements, offices, and garages Start Date: 03/16/2026 Start Time: 7:00 am End Date: 03/16/2026 End Time: 3:00 pm Work Type: Fire Sprinklers Water Tfc Event: yes Project Owner: Christian L. Guerra TFC Project Num: N/A TFC WorkOrder Num: N/A
DSHS F Building (DHF)
BP8 Reroofs of Bldgs. F,G,K & DHNP (03/16 - 03/20)
Building: DSHS F Building (DHF)
Location / Room: Bldg F Roof Start Date: 03/16/2026 Start Time: 6:00 am End Date: 03/20/2026 End Time: 4:00 pm Work Type: Hot Work Permit (3 days required) Tfc Event: No Project Owner: Ronald Lunsford TFC Project Num: DM 20-013-5485 & 2519 TFC WorkOrder Num: na
DSHS New Power Plant (DHNP)
Hot Work Permit (Old DHNP Roof) (03/16 - 03/20)
Building: DSHS New Power Plant (DHNP)
Location / Room: Old DHNP Roof Start Date: 03/16/2026 Start Time: 7:00AM End Date: 03/20/2026 End Time: 3:00PM Work Type: Hot Work Permit (3 days required) Tfc Event: yes Project Owner: Ronald Lunsford TFC Project Num: 20-013-5485 & 2519 TFC WorkOrder Num: N/A
James Earl Rudder Building (JER)
JE Rudder Building Renovation Project (03/16 - 12/08)
Building: James Earl Rudder Building (JER)
Location / Room: Entire Building Renovation Start Date: 03/16/2026 Start Time: 7:00 End Date: 12/08/2026 End Time: 12:00 Work Type: Demolition work Tfc Event: yes Project Owner: Kevin Sandberg TFC Project Num: 25-026-3113 TFC WorkOrder Num: Na |
17
William P Clements Building (WPC)
WPC elevator 5 maintenance (03/17 - 03/18)
Building: William P Clements Building (WPC)
Location / Room: Elevator shafts 5 & 6. Start Date: 03/17/2026 Start Time: 7:00AM End Date: 03/18/2026 End Time: 4:30 pm Work Type: Elevators Tfc Event: yes Project Owner: Samuel Coonrod TFC Project Num: TFC WorkOrder Num: N/A
Texas School for the Deaf (TSD)
Semiannual Fire Sprinkler Inspections (03/17 - 03/19)
Building: Texas School for the Deaf (TSD)
Location / Room: All rooms; including riser rooms, attics, and basements, offices, and garages Start Date: 03/17/2026 Start Time: 7:00 am End Date: 03/19/2026 End Time: 3:00 pm Work Type: Fire Sprinklers Water Tfc Event: yes Project Owner: Christian L. Guerra TFC Project Num: N/A TFC WorkOrder Num: N/A
North Austin Complex (NACA)
NACA 7th Floor Renovation (03/17 - 04/24)
Building: North Austin Complex (NACA)
Location / Room: NACA 7th Floor Start Date: 03/17/2026 Start Time: 6:30am End Date: 04/24/2026 End Time: 5:30pm Work Type: Noise Notice – Daytime Tfc Event: No Project Owner: Brad Tilghman TFC Project Num: NA TFC WorkOrder Num: 997222 |
18 |
19
Tom C Clark Building (TCC)
PDB/TCC/SCB Panel change out shutdown. (12/19 - 12/24)
Building: Tom C Clark Building (TCC)
Location / Room: Entire buildings Start Date: 12/19/2025 Start Time: 05:00 pm End Date: 12/24/2025 End Time: 10:00 pm Work Type: Other Tfc Event: No Project Owner: Ricardo Guerra TFC Project Num: 3506 TFC WorkOrder Num: NA
Human Services Warehouse (HSW)
Building Fire Alarm System (03/19 - 03/19)
Building: Human Services Warehouse (HSW)
Location / Room: Whole Building Start Date: 03/19/2026 Start Time: 7:00 End Date: 03/19/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: TFC WorkOrder Num:
Brown Heatly Building (BHB)
BHB PDU replacement and Electrical upgrade (03/19 - 03/19)
Building: Brown Heatly Building (BHB)
Location / Room: PDUs A & B 3rd floor Start Date: 03/19/2026 Start Time: 7:00 AM End Date: 03/19/2026 End Time: 11:00 AM Work Type: Electrical Tfc Event: yes Project Owner: Thomas McMurtray TFC Project Num: PR 25655 TFC WorkOrder Num: 898473 |
20
William B Travis Building
7th Floor Commissioners Room Renovation (10/20 - 11/20)
Building: William B Travis Building
Location / Room: 7th Floor Commissioners Room Start Date: 10/20/2025 Start Time: 6:00am End Date: 11/20/2025 End Time: 5:00 pm Work Type: Noise Notice – Daytime Tfc Event: No Project Owner: Tremaine Wingfield TFC Project Num: 993474 TFC WorkOrder Num: 993474
Park 35 Bldg. A (P35A)
Restripe (03/20 - 03/22)
Building: Park 35 Bldg. A (P35A)
Location / Room: Start Date: 03/20/2026 Start Time: 7:00 End Date: 03/22/2026 End Time: 17:00 Work Type: General Maintenance Tfc Event: No Project Owner: Damiena Levitt TFC Project Num: 26-0001016 TFC WorkOrder Num: WO 1015343
Stephen F Austin Building (SFA)
SFA 1003 Suite Renovation (03/20 - 03/22)
Building: Stephen F Austin Building (SFA)
Location / Room: SFA 1003 Office Renovation Start Date: 03/20/2026 Start Time: 6:30am End Date: 03/22/2026 End Time: 5:30pm Work Type: Noise Notice – Daytime Tfc Event: No Project Owner: Tremaine Wingfield TFC Project Num: 994852 TFC WorkOrder Num: 994852
Stephen F Austin Building (SFA)
SFA 730 Concrete Coring Project (03/20 - 03/22)
Building: Stephen F Austin Building (SFA)
Location / Room: SFA 730 Start Date: 03/20/2026 Start Time: 7:00am End Date: 03/22/2026 End Time: 5:30pm Work Type: Demolition work Tfc Event: No Project Owner: Tremaine Wingfield TFC Project Num: 993398 TFC WorkOrder Num: 993398
Stephen F Austin Building (SFA)
SFA 800-860 - GPT Scan and Coring (03/20 - 03/22)
Building: Stephen F Austin Building (SFA)
Location / Room: SFA Suite 800-860 Start Date: 03/20/2026 Start Time: 6:30am End Date: 03/22/2026 End Time: 5:30pm Work Type: Noise Notice – Daytime Tfc Event: No Project Owner: Tremaine Wingfield TFC Project Num: 994857 TFC WorkOrder Num: 994857
John H. Winters Building (JHW)
Flooring Replacement 1st Floor Vestibules (03/20 - 03/21)
Building: John H. Winters Building (JHW)
Location / Room: 1st Floor Tower North & South Vestibules Start Date: 03/20/2026 Start Time: 7:00 PM End Date: 03/21/2026 End Time: 5:00 pm Work Type: Carpentry Tfc Event: No Project Owner: Brad Tilghman TFC Project Num: TFC WorkOrder Num: 1019042 |
21
Central Power Plant (CPP)
CPP Steam Shutdown (3-14-2026, Saturday) (03/21 - 03/21)
Building: Central Power Plant (CPP)
Location / Room: Boiler Room Start Date: 03/21/2026 Start Time: 6:00 am End Date: 03/21/2026 End Time: 2:00 pm Work Type: Hot Work Permit (3 days required) Tfc Event: yes Project Owner: Ernesto Garcia TFC Project Num: N/A TFC WorkOrder Num: 2604037
Park 35 Bldg. A (P35A)
P35A CHW Valve Replacement (03/21 - 03/21)
Building: Park 35 Bldg. A (P35A)
Location / Room: Chiller Plant Start Date: 03/21/2026 Start Time: 6:30 AM End Date: 03/21/2026 End Time: 6:00 pm Work Type: Hot Work Permit (3 days required) Tfc Event: yes Project Owner: Deano Alvarado TFC Project Num: Na TFC WorkOrder Num: 1015996
Park 35 Bldg. A (P35A)
P35A CHW Valve Replacement (03/21 - 03/21)
Building: Park 35 Bldg. A (P35A)
Location / Room: Chiller Plant Start Date: 03/21/2026 Start Time: 6:30 AM End Date: 03/21/2026 End Time: 6:00 pm Work Type: Hot Work Permit (3 days required) Tfc Event: yes Project Owner: Deano Alvarado TFC Project Num: Na TFC WorkOrder Num: 1015996
Human Services Warehouse (HSW)
Building Fire Alarm System (03/21 - 03/21)
Building: Human Services Warehouse (HSW)
Location / Room: Whole Building Start Date: 03/21/2026 Start Time: 7:00 End Date: 03/21/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: TFC WorkOrder Num:
DSHS Records Building (DHR)
Building Fire Alarm System (03/21 - 03/21)
Building: DSHS Records Building (DHR)
Location / Room: Whole Building Start Date: 03/21/2026 Start Time: 7:00 End Date: 03/21/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: TFC WorkOrder Num:
Tom C Clark Building (TCC)
SCB-TCC-PDB Electrical Trace/Power breaker testing (03/21 - 03/21)
Building: Tom C Clark Building (TCC)
Location / Room: PKM Server Room,TCC 7th Floor Server Room, TCC Roof Cooling Units Start Date: 03/21/2026 Start Time: 6:00 am End Date: 03/21/2026 End Time: 2:30 PM Work Type: Electrical Tfc Event: No Project Owner: Ricardo Guerra TFC Project Num: 5155 TFC WorkOrder Num: 01 |
|
22
Human Services Warehouse
Annual Elevator Inspections (10/22 - 10/22)
Building: Human Services Warehouse
Location / Room: Elevators Start Date: 10/22/2025 Start Time: 8:00 am End Date: 10/22/2025 End Time: 9:00 Work Type: Elevators Tfc Event: yes Project Owner: James Wooley TFC Project Num: N/A TFC WorkOrder Num: N/A |
23
Stephen F Austin Building (SFA)
SFA 1003 Suite Renovation (03/23 - 05/08)
Building: Stephen F Austin Building (SFA)
Location / Room: SFA 1003 Office Renovation Start Date: 03/23/2026 Start Time: 6:30am End Date: 05/08/2026 End Time: 5:30pm Work Type: Noise Notice – Daytime Tfc Event: No Project Owner: Tremaine Wingfield TFC Project Num: 994852 TFC WorkOrder Num: 994852
Central Utility Plant Expansion (CUPX)
Building Fire Alarm System (03/23 - 03/23)
Building: Central Utility Plant Expansion (CUPX)
Location / Room: Whole Building Start Date: 03/23/2026 Start Time: 7:00 End Date: 03/23/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: TFC WorkOrder Num:
Central Utility Plant Expansion (CUPX)
Building Fire Alarm System (03/23 - 03/23)
Building: Central Utility Plant Expansion (CUPX)
Location / Room: Whole Building Start Date: 03/23/2026 Start Time: 7:00 End Date: 03/23/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: TFC WorkOrder Num: |
24
John H. Winters Building (JHW)
Annual Elevator Inspections (03/24 - 03/24)
Building: John H. Winters Building (JHW)
Location / Room: Elevators Start Date: 03/24/2026 Start Time: 7:00 am End Date: 03/24/2026 End Time: 5:00 pm Work Type: Elevators Tfc Event: yes Project Owner: Jason Charron TFC Project Num: TFC WorkOrder Num: N/A
Parking Garage Q (PKQ)
Building Fire Alarm System (03/24 - 03/24)
Building: Parking Garage Q (PKQ)
Location / Room: Whole Building Start Date: 03/24/2026 Start Time: 7:00 End Date: 03/24/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: TFC WorkOrder Num:
Parking Garage Q (PKQ)
Building Fire Alarm System (03/24 - 03/24)
Building: Parking Garage Q (PKQ)
Location / Room: Whole Building Start Date: 03/24/2026 Start Time: 7:00 End Date: 03/24/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: TFC WorkOrder Num:
Other
Phase 2 water line FULL shut out for tie ins (03/24 - 03/25)
Building: Other
Location / Room: Start Date: 03/24/2026 Start Time: 10:00pm End Date: 03/25/2026 End Time: 6:00am Work Type: Domestic water Tfc Event: yes Project Owner: Cheryl Taylor TFC Project Num: Na TFC WorkOrder Num: Na |
25
Parking Garage E (PKE)
Building Fire Alarm System Input & Output devices (03/25 - 03/25)
Building: Parking Garage E (PKE)
Location / Room: Whole Building Start Date: 03/25/2026 Start Time: 7:00 End Date: 03/25/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: Na TFC WorkOrder Num: Na
Parking Garage F (PKF)
Building Fire Alarm System Input & Output devices (03/25 - 03/25)
Building: Parking Garage F (PKF)
Location / Room: Whole Building Start Date: 03/25/2026 Start Time: 7:00 End Date: 03/25/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: Na TFC WorkOrder Num: Na
Parking Garage G (PKG)
Building Fire Alarm System Input & Output devices (03/25 - 03/25)
Building: Parking Garage G (PKG)
Location / Room: Whole Building Start Date: 03/25/2026 Start Time: 7:00 End Date: 03/25/2026 End Time: 17:00 Work Type: Fire Alarm Testing Tfc Event: yes Project Owner: Tony Barrientos TFC Project Num: Na TFC WorkOrder Num: Na
Central Services Building (CSB)
Patch, repaint corridors (03/25 - 03/30)
Building: Central Services Building (CSB)
Location / Room: Start Date: 03/25/2026 Start Time: 18:00 End Date: 03/30/2026 End Time: 17:00 Work Type: Carpentry Tfc Event: No Project Owner: Anthony Rogers TFC Project Num: WO#2611125 TFC WorkOrder Num: WO#2611125 |
26
Parking Garage R (PKR)
PKR - Panel P2 Electrical Tie In (03/26 - 03/26)
Building: Parking Garage R (PKR)
Location / Room: Elec 104 - Panel P2 Start Date: 03/26/2026 Start Time: 4:00pm End Date: 03/26/2026 End Time: 6:00pm Work Type: Electrical Tfc Event: No Project Owner: Marcus Davis TFC Project Num: 20-014-5900 TFC WorkOrder Num: Na
DSHS New Power Plant (DHNP)
BP8 Reroofs of Bldgs. F,G,K & DHNP (03/26 - 04/02)
Building: DSHS New Power Plant (DHNP)
Location / Room: Bldg F & DHNP Start Date: 03/26/2026 Start Time: 6:00 am End Date: 04/02/2026 End Time: 4:00 pm Work Type: Hot Work Permit (3 days required) Tfc Event: No Project Owner: Ronald Lunsford TFC Project Num: DM 20-013-5485 & 2519 TFC WorkOrder Num: na |
27
Barbara Jordan Building (BJB)
FY26 BJB Ceiling Repair (03/27 - 03/29)
Building: Barbara Jordan Building (BJB)
Location / Room: 2.036 Start Date: 03/27/2026 Start Time: 6:00 pm End Date: 03/29/2026 End Time: 10:00 pm Work Type: General Maintenance Tfc Event: yes Project Owner: Anthony Rogers TFC Project Num: NA TFC WorkOrder Num: 998825
Other
Functional testing (03/27 - 03/28)
Building: Other
Location / Room: R E Johnson Building non-critical HVAC systems (affected areas listed below) Start Date: 03/27/2026 Start Time: 8:00 pm End Date: 03/28/2026 End Time: 9:00 am Work Type: Other Tfc Event: No Project Owner: Nientzu Hsia TFC Project Num: 23-002-1221 TFC WorkOrder Num: Na |
28
North Congress State Building(NCSB)
15th St Duct Bank installation for NCSB project (03/28 - 03/29)
Building: North Congress State Building(NCSB)
Location / Room: 15th St between Colorado and Congress Start Date: 03/28/2026 Start Time: 7:00am End Date: 03/29/2026 End Time: 7:00pm Work Type: Traffic Lane closures Tfc Event: yes Project Owner: Cheryl Taylor TFC Project Num: 8011 TFC WorkOrder Num: |
|
29 |
30
Insurance Warehouse (INW)
INW Parking Lot Striping (03/30 - 04/02)
Building: Insurance Warehouse (INW)
Location / Room: Back parking lot Start Date: 03/30/2026 Start Time: 7:00am End Date: 04/02/2026 End Time: 4:00 pm Work Type: Painting Tfc Event: yes Project Owner: Anthony Rogers TFC Project Num: BA TFC WorkOrder Num: 1021362
William B Travis Building (WBT)
Ground floor G.000.1 Entry Closure notification (03/30 - 04/03)
Building: William B Travis Building (WBT)
Location / Room: G.000.1 & G.000.2 Start Date: 03/30/2026 Start Time: 6:00am End Date: 04/03/2026 End Time: 2:30pm Work Type: Sidewalk or building access closures Tfc Event: No Project Owner: Jason Nezamabadi TFC Project Num: 24-003-4202 TFC WorkOrder Num: Na
DSHS F Building (DHF)
DHF F121 Build Temporary Wall (03/30 - 04/10)
Building: DSHS F Building (DHF)
Location / Room: F121 Cafeteria Start Date: 03/30/2026 Start Time: 7:00 am End Date: 04/10/2026 End Time: 5:00 pm Work Type: Carpentry Tfc Event: No Project Owner: Brad Tilghman TFC Project Num: NA TFC WorkOrder Num: 1019777 |
31
Parking Garage P Plant (PKPP)
TFC Ph VI Energy Conservation Project CT Meter (03/31 - 04/02)
Building: Parking Garage P Plant (PKPP)
Location / Room: Plant Mechanical Room Start Date: 03/31/2026 Start Time: 7:00 End Date: 04/02/2026 End Time: 3:00pm Work Type: Cooling System Tfc Event: yes Project Owner: Nientzu Hsia TFC Project Num: 23-003-1222 TFC WorkOrder Num: Na
North Austin Complex (NACA)
NACA 7th Floor Renovation Fire Alarm Work (03/31 - 04/02)
Building: North Austin Complex (NACA)
Location / Room: NACA 7th Floor Start Date: 03/31/2026 Start Time: 7:00am End Date: 04/02/2026 End Time: 5:00pm Work Type: Fire Alarm Testing Tfc Event: No Project Owner: Brad Tilghman TFC Project Num: TFC WorkOrder Num: 997222
North Austin Complex (NACA)
NACA 7th Floor Renovation Fire Sprinkler Work (03/31 - 04/02)
Building: North Austin Complex (NACA)
Location / Room: NACA 7th Floor Start Date: 03/31/2026 Start Time: 7:00am End Date: 04/02/2026 End Time: 5:30pm Work Type: Fire Sprinklers Water Tfc Event: No Project Owner: Brad Tilghman TFC Project Num: TFC WorkOrder Num: 997222
Parking Garage R (PKR)
PKR - Paint at Level 1 NE Elevator Lobby Door (03/31 - 03/31)
Building: Parking Garage R (PKR)
Location / Room: Level 1 NE Elevator Lobby Start Date: 03/31/2026 Start Time: 7:00am End Date: 03/31/2026 End Time: 4:00pm Work Type: Painting Tfc Event: No Project Owner: Marcus Davis TFC Project Num: 20-014-5900 TFC WorkOrder Num: Na
Promontory Point (PROM)
Promp Dock Leveler Install (03/31 - 04/01)
Building: Promontory Point (PROM)
Location / Room: Dock Start Date: 03/31/2026 Start Time: 10:00 End Date: 04/01/2026 End Time: 5:00 pm Work Type: Hot Work Permit (3 days required) Tfc Event: No Project Owner: Anthony Rogers TFC Project Num: 1014177 TFC WorkOrder Num: 1014177 |