Mandate: The 89th Texas Legislature enacted SB1 (Rider 23 in TFC Bill Pattern) which mandates that all Capitol Complex Tenants be notified of planned disruption site work events to business operations, 14 days prior to the work being performed.
To fulfill the mandate of the rider, and improve business efficiency and tenant relations, TFC has created a public calendar and report on all scheduled planned disruptions events. This new resource will allow tenant agencies to look up work events for specific buildings at their convenience.
TFC Tenants and stakeholders will continue to receive email notification from our TFC Liaison Team. If you would like to receive notifications, please sign up.
Day View | Week View | Month View
| Postponed | Rescheduled | Scheduled |
| Event # | Status | TFC Work | Notice Type | Work Type | Event Date | Work Start Date | Work Start Time | Work End Date | Work End Time | Building | Location & Room | Event Name | TFC Owner Last Name | Impacts | Justification | WO# / Project Number |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 707 | Scheduled | yes | Shutdown | Cooling System | 2026-04-11 | 2026-04-11 | 7:00 | 2026-04-12 | 3:00pm | Robert D. Moreton Building (RDM) | Plant Mechanical Room | TFC Ph VI Energy Conservation Project Water Meter | Hsia |
- Interior temperature variations - Cooling Tower Shutdown |
Project Work | Na / 23-003-1222 |
| 703 | Scheduled | yes | Shutdown | Domestic water | 2026-03-24 | 2026-03-24 | 10:00pm | 2026-03-25 | 6:00am | Other | Phase 2 water line FULL shut out for tie ins | Taylor |
- Construction noise (night-time) - No Domestic Water - No Hot Water |
Utility or Infrastructure Work | Na / Na | |
| 701 | Scheduled | yes | Construction Work | Cooling System | 2026-04-13 | 2026-04-13 | 7:00 | 2026-04-14 | 3:00pm | North Austin Complex (NACA) | Plant Mechanical Room | TFC Ph VI Energy Conservation Project CT Meter | Hsia |
- impactOther |
Project Work | Na / 23-003-1222 |
| 700 | Scheduled | yes | Construction Work | Cooling System | 2026-04-09 | 2026-04-09 | 7:00 | 2026-04-10 | 3:00pm | Central Utility Plant Expansion (CUPX) | Plant Mechanical Room | TFC Ph VI Energy Conservation Project CT Meter | Hsia |
- impactOther |
Project Work | Na / 23-003-1222 |
| 699 | Scheduled | yes | Construction Work | Cooling System | 2026-04-08 | 2026-04-08 | 7:00 | 2026-04-09 | 3:00pm | Park 35 Bldg. C (P35C) | Plant Mechanical Room | TFC Ph VI Energy Conservation Project CT Meter | Hsia |
- impactOther |
Project Work | Na / 23-003-1222 |
| 698 | Scheduled | yes | Construction Work | Cooling System | 2026-04-07 | 2026-04-07 | 7:00 | 2026-04-08 | 3:00pm | DSHS Old Plant (DHOP) | Plant Mechanical Room | TFC Ph VI Energy Conservation Project CT Meter | Hsia |
- impactOther |
Project Work | Na / 23-003-1222 |
| 697 | Scheduled | yes | Construction Work | Cooling System | 2026-04-06 | 2026-04-06 | 7:00 | 2026-04-07 | 3:00pm | Brown Heatly Building (BHB) | Plant Mechanical Room | TFC Ph VI Energy Conservation Project CT Meter | Hsia |
- impactOther |
Project Work | Na / 23-003-1222 |
| 696 | Scheduled | yes | Construction Work | Cooling System | 2026-04-02 | 2026-04-02 | 7:00 | 2026-04-03 | 3:00pm | Ernest O Thompson Building (THO) | Plant Mechanical Room | TFC Ph VI Energy Conservation Project CT Meter | Hsia |
- impactOther |
Project Work | Na / 23-003-1222 |
| 695 | Scheduled | yes | Construction Work | Cooling System | 2026-04-01 | 2026-04-01 | 7:00 | 2026-04-02 | 3:00pm | Stephen F Austin Building (SFA) | Plant Mechanical Room | TFC Ph VI Energy Conservation Project CT Meter | Hsia |
- impactOther |
Project Work | Na / 23-003-1222 |
| 694 | Scheduled | yes | Construction Work | Cooling System | 2026-03-31 | 2026-03-31 | 7:00 | 2026-04-02 | 3:00pm | Parking Garage P Plant (PKPP) | Plant Mechanical Room | TFC Ph VI Energy Conservation Project CT Meter | Hsia |
- impactOther |
Project Work | Na / 23-003-1222 |
| 692 | Scheduled | No | Construction Work | Noise Notice – Daytime | 2026-03-20 | 2026-03-20 | 6:30am | 2026-03-22 | 5:30pm | Stephen F Austin Building (SFA) | SFA Suite 800-860 | SFA 800-860 - GPT Scan and Coring | Wingfield |
- Construction Dust - Construction noise daytime - Limited building access |
Tenant Remodeling | 994857 / 994857 |
| 691 | Scheduled | No | Construction Work | Demolition work | 2026-03-20 | 2026-03-20 | 7:00am | 2026-03-22 | 5:30pm | Stephen F Austin Building (SFA) | SFA 730 | SFA 730 Concrete Coring Project | Wingfield |
- Construction Dust - Construction noise daytime - Construction noise (night-time) - Limited building access |
Tenant Remodeling | 993398 / 993398 |
| 690 | Scheduled | yes | Shutdown | Fire Alarm Testing | 2026-03-24 | 2026-03-24 | 7:00 | 2026-03-24 | 17:00 | Parking Garage Q (PKQ) | Whole Building | Building Fire Alarm System | Barrientos |
- Fire Drill |
Life Safety | / |
| 689 | Scheduled | yes | Shutdown | Fire Alarm Testing | 2026-03-24 | 2026-03-24 | 7:00 | 2026-03-24 | 17:00 | Parking Garage Q (PKQ) | Whole Building | Building Fire Alarm System | Barrientos |
- Fire Drill |
Life Safety | / |
| 688 | Scheduled | No | Construction Work | Noise Notice – Daytime | 2026-03-20 | 2026-03-20 | 6:30am | 2026-03-22 | 5:30pm | Stephen F Austin Building (SFA) | SFA 1003 Office Renovation | SFA 1003 Suite Renovation | Wingfield |
- Construction Dust - Construction noise daytime - impactLimitedBuildingAccess |
Tenant Remodeling | 994852 / 994852 |
| 687 | Scheduled | yes | Construction Work | Painting | 2026-03-23 | 2026-03-23 | 7:00am | 2026-03-27 | 4:00 pm | Insurance Warehouse (INW) | Back parking lot | INW Parking Lot Striping | Rogers | General Maintenance | 1021362 / BA | |
| 686 | Scheduled | yes | Shutdown | Fire Alarm Testing | 2026-03-23 | 2026-03-23 | 7:00 | 2026-03-23 | 17:00 | Central Utility Plant Expansion (CUPX) | Whole Building | Building Fire Alarm System | Barrientos |
- Fire Drill |
Life Safety | / |
| 685 | Scheduled | yes | Shutdown | Fire Alarm Testing | 2026-03-23 | 2026-03-23 | 7:00 | 2026-03-23 | 17:00 | Central Utility Plant Expansion (CUPX) | Whole Building | Building Fire Alarm System | Barrientos |
- Fire Drill |
Life Safety | / |
| 684 | Scheduled | yes | Construction Work | General Maintenance | 2026-03-27 | 2026-03-27 | 6:00 pm | 2026-03-29 | 10:00 pm | Barbara Jordan Building (BJB) | 2.036 | FY26 BJB Ceiling Repair | Rogers |
- Construction Dust - Construction noise (night-time) |
General Maintenance | 998825 / NA |
| 683 | Scheduled | yes | Maintenance Services | Fire Sprinklers Water | 2026-03-17 | 2026-03-17 | 7:00 am | 2026-03-19 | 3:00 pm | Texas School for the Deaf (TSD) | All rooms; including riser rooms, attics, and basements, offices, and garages | Semiannual Fire Sprinkler Inspections | Guerra |
- Fire Drill |
Life Safety | N/A / N/A |
| 682 | Scheduled | yes | Maintenance Services | Fire Sprinklers Water | 2026-03-16 | 2026-03-16 | 7:00 am | 2026-03-16 | 3:00 pm | Texas School for the Blind and Visually Impaired (TSBVI) | All rooms; including riser rooms, attics, and basements, offices, and garages | Semiannual Fire Sprinkler Inspections | Guerra |
- Fire Drill |
Life Safety | N/A / N/A |
| 681 | Scheduled | yes | Maintenance Services | Elevators | 2026-03-24 | 2026-03-24 | 7:00 am | 2026-03-24 | 5:00 pm | John H. Winters Building (JHW) | Elevators | Annual Elevator Inspections | Charron |
- Limited elevator access |
Other | N/A / |
| 680 | Scheduled | yes | Shutdown | Fire Alarm Testing | 2026-03-25 | 2026-03-25 | 7:00 | 2026-03-25 | 17:00 | Parking Garage G (PKG) | Whole Building | Building Fire Alarm System Input & Output devices | Barrientos |
- Fire Drill |
Life Safety | Na / Na |
| 679 | Scheduled | yes | Shutdown | Fire Alarm Testing | 2026-03-25 | 2026-03-25 | 7:00 | 2026-03-25 | 17:00 | Parking Garage F (PKF) | Whole Building | Building Fire Alarm System Input & Output devices | Barrientos |
- Fire Drill |
Life Safety | Na / Na |
| 678 | Scheduled | yes | Shutdown | Fire Alarm Testing | 2026-03-25 | 2026-03-25 | 7:00 | 2026-03-25 | 17:00 | Parking Garage E (PKE) | Whole Building | Building Fire Alarm System Input & Output devices | Barrientos |
- Fire Drill |
Life Safety | Na / Na |
| 676 | Scheduled | yes | Construction Work | Traffic Lane closures | 2026-03-14 | 2026-03-14 | 7:00am | 2026-03-15 | 7:00pm | North Congress State Building(NCSB) | 15th St between Colorado and Congress | 15th St Duct Bank installation for NCSB project | Taylor |
- Construction Dust - Construction noise daytime - Road Closure/ Detour - Traffic Congestion |
Utility or Infrastructure Work | / 20-028-8011 |
| 674 | Scheduled | yes | Shutdown | Fire Alarm Testing | 2026-03-21 | 2026-03-21 | 7:00 | 2026-03-21 | 17:00 | DSHS Records Building (DHR) | Whole Building | Building Fire Alarm System | Barrientos |
- Fire Drill |
Life Safety | / |
| 672 | Scheduled | yes | Shutdown | Elevators | 2026-03-17 | 2026-03-17 | 7:00AM | 2026-03-18 | 4:30 pm | William P Clements Building (WPC) | Elevator shafts 5 & 6. | WPC elevator 5 maintenance | Coonrod |
- Construction noise daytime - Off - Limited elevator access - Off |
Routine Maintenance | N/A / |
| 670 | Scheduled | No | Construction Work | Hot Work Permit (3 days required) | 2026-03-09 | 2026-03-09 | 6:00 am | 2026-03-13 | 4:00 pm | DSHS F Building (DHF) | Bldg F Roof | BP8 Reroofs of Bldgs. F,G,K & DHNP | Lunsford |
- Off |
Project Work | na / DM 20-013-5485 & 2519 |
| 666 | Scheduled | yes | Maintenance Services | Hot Work Permit (3 days required) | 2026-03-21 | 2026-03-21 | 6:30 AM | 2026-03-21 | 6:00 pm | Park 35 Bldg. A (P35A) | Chiller Plant | P35A CHW Valve Replacement | Alvarado |
- Hot Work Permit |
General Maintenance | 1015996 / Na |
| 662 | Scheduled | No | Shutdown | Electrical | 2026-03-12 | 2026-03-12 | 9:00 am | 2026-03-13 | 4:00 pm | DSHS F Building (DHF) | Building F - Room F112.3 | HWP Compressor Change-out | Sandberg |
- impactConstructionNoiseNight - impactInteriorTemperatureVariations - impactLossOfPower |
Tenant Remodeling | N/A / 20-017-5610 |
| 656 | Scheduled | No | Shutdown | Electrical | 2026-03-10 | 2026-03-10 | 7:00 am | 2026-03-10 | 7:15 am | William B Travis Building (WBT) | 1ME | Connect 1SX circuit | Nezamabadi |
- Loss of power |
Project Work | Na / 24-003-4202 |
| 655 | Scheduled | yes | Maintenance Services | Hot Work Permit (3 days required) | 2026-03-21 | 2026-03-21 | 6:30 AM | 2026-03-21 | 6:00 pm | Park 35 Bldg. A (P35A) | Chiller Plant | P35A CHW Valve Replacement | Alvarado |
- impactOther |
General Maintenance | 1015996 / Na |
| 647 | Scheduled | yes | Shutdown | Fire Alarm Testing | 2026-03-11 | 2026-03-11 | 7:00 | 2026-03-11 | 17:00 | Promontory Point (PROM) | TPWC Whole Building | Building Fire Alarm System Output Devices | Barrientos |
- Fire Drill |
Life Safety | Na / Na |
| 646 | Scheduled | yes | Shutdown | Fire Alarm Testing | 2026-03-11 | 2026-03-11 | 7:00 | 2026-03-11 | 17:00 | Promontory Point (PROM) | TPWC Whole Building | Building Fire Alarm System Input Devices | Barrientos |
- Fire Drill |
Life Safety | Na / Na |
| 642 | Scheduled | No | Construction Work | Noise Notice – Daytime | 2026-03-09 | 2026-03-09 | 6:30am | 2026-04-20 | 5:30pm | Stephen F Austin Building (SFA) | SFA Suite 800-860 | SFA 800-860 Renovation | Wingfield |
- Construction Dust - Construction noise daytime - Limited building access |
Tenant Remodeling | 994857 / 994857 |
| 635 | Scheduled | No | Construction Work | Electrical | 2026-03-10 | 2026-03-10 | 6:30 | 2026-03-10 | 14:00 | William B Travis Building (WBT) | 2E | 2NL Panel Shutdown | Nezamabadi |
- Loss of power |
Project Work | Na / 24-003-4202 |
| 625 | Scheduled | yes | Shutdown | Hot Work Permit (3 days required) | 2026-03-21 | 2026-03-21 | 6:00 am | 2026-03-21 | 2:00 pm | Central Power Plant (CPP) | Boiler Room | CPP Steam Shutdown (3-14-2026, Saturday) | Garcia |
- impactOther |
Emergency Repair | 2604037 / N/A |
| 618 | Scheduled | No | Construction Work | General Maintenance | 2026-03-20 | 2026-03-20 | 7:00 | 2026-03-22 | 17:00 | Park 35 Bldg. A (P35A) | Restripe | Levitt |
- Construction noise daytime |
General Maintenance | WO 1015343 / 26-0001016 | |
| 616 | Scheduled | yes | Shutdown | Demolition work | 2026-03-02 | 2026-03-02 | 9:00 AM | 2026-04-17 | 5:00 PM | Park 35 Bldg. B (P35B) | 1st floor hallway,1001,1002,1003,1004,224, 1st floor water lab | P35-B Remediation | Rogers |
- Construction Dust - Construction noise daytime |
Other | Na / 26-8114 |
| 613 | Scheduled | No | Shutdown | Electrical | 2026-03-02 | 2026-03-02 | 6:00am | 2026-03-20 | 6:00pm | Parking Garage R (PKR) | Garage Levels 1-3 (one level per week) | External LED Indicator Installation | Davis |
- Construction noise daytime - Limited building access - Traffic Congestion |
Project Work | Na / 20-014-5900 |
| 610 | Scheduled | No | Construction Work | Painting | 2026-02-23 | 2026-02-23 | 7:00am | 2026-03-13 | 6:00pm | William B Travis Building (WBT) | WBT 11th Floor | 11th Floor Paint Renovation | Tilghman |
- Construction noise daytime - Limited building access |
Tenant Remodeling | 1006885 / Na |
| 607 | Postponed | yes | Shutdown | Electrical | 2026-02-15 | 2026-02-15 | 7:00 AM | 2026-02-15 | 11:30 am | Brown Heatly Building (BHB) | 3rd floor Electrical room | 3rd floor panel 3DPA shutdown | Gonzalez |
- Loss of power |
Project Work | WO 930675 / PR 27432 |
| 578 | Scheduled | yes | Shutdown | Other | 2026-06-13 | 2026-06-13 | 7:00am | 2026-06-13 | 4:00pm | Ernest O Thompson Building (THO) | Main electric room | Breaker testing and maintenance | Coonrod |
- Interior temperature variations - Limited building access - Limited elevator access - Loss of power - No Domestic Water - No Hot Water |
Utility or Infrastructure Work | 1015510 / Na |
| 570 | Scheduled | No | Construction Work | Carpentry | 2026-02-25 | 2026-02-25 | 7:00 AM | 2026-03-13 | 3:00 PM | William B Travis Building (WBT) | Suite 4-100 | 4th Fl. Seating Area | Gonzalez |
- Construction Dust - Construction noise daytime |
Project Work | 1010203 / Na |
| 568 | Scheduled | yes | Construction Work | General Maintenance | 2026-02-18 | 2026-02-18 | 7:00 am | 2026-04-30 | 4:00 pm | Central Services Annex (CSX) | Exterior North Face, 204, 206 | Waterproofing and Interior Stucco Repairs | Rogers |
- Construction Dust - Construction noise (night-time) |
General Maintenance | 909337 / 909337 |
| 475 | Scheduled | No | Shutdown | Elevators | 2026-01-09 | 2026-01-09 | 6:00am | 2026-04-30 | 6:00pm | Stephen F Austin Building (SFA) | Elevator Machine Room (Penthouse), Elevator Bank 1 (PE 4,5,6) | Elevator Modernization (PE 4,5, and 6) | Davis |
- Limited elevator access |
Project Work | 24-033-4201 / 24-49-000 |
| 447 | Scheduled | yes | Maintenance Services | Hot Work Permit (3 days required) | 2026-03-16 | 2026-03-16 | 8:00 am | 2026-03-20 | 5:00 pm | Lyndon B Johnson Building (LBJ) | LBJ Granite Facade Repair | Barron |
- Construction Dust - Construction noise daytime - Sidewalk Closure / Detour |
General Maintenance | 859072 / 26-0000604 | |
| 436 | Scheduled | No | Construction Work | Noise Notice – Daytime | 2026-01-12 | 2026-01-12 | 06:00 am | 2026-09-13 | 03:00 pm | William P Clements Building (WPC) | All floors. | Clements fire alarm work | Guerra |
- Construction Dust - Construction noise daytime - Off - Off - Off - Limited elevator access - Off - Off - Off - Off - Off - Off |
Project Work | na / 3506 |
| 374 | Scheduled | No | Construction Work | Other | 2025-12-17 | 2025-12-17 | 6:00am | 2026-10-01 | 4:30pm | William B Travis Building (WBT) | Nezamabadi |
- Construction Dust - Construction noise daytime |
Project Work | N/A / 24-003-4202 | ||
| 253 | Scheduled | No | Construction Work | General Maintenance | 2025-11-03 | 2025-11-03 | 6:00am | 2026-09-11 | 4:00pm | William B Travis Building (WBT) | Levels 5 through 6 Rennovation | GMP2 Construction Start | Nezamabadi |
- Construction Dust - Construction noise daytime - Interior temperature variations - Off - Limited elevator access - Loss of power |
Project Work | N/A / 24-003-4202 |
| 250 | Rescheduled | No | Construction Work | Hot Work Permit (3 days required) | 2025-11-03 | 2025-11-03 | 0600 | 2025-11-07 | 1400 | Dr. Bob Glaze Lab (DBGL) | 1st Floor Mechanical Room | DSI HWP | Lunsford |
- Fire Drill |
Project Work | na / 20-013-5485/20-013-2519 |
| 177 | Postponed | No | Construction Work | Other | 2025-12-19 | 2025-12-19 | 05:00 pm | 2025-12-24 | 10:00 pm | Tom C Clark Building (TCC) | Entire buildings | PDB/TCC/SCB Panel change out shutdown. | Guerra |
- Construction Dust - Construction noise daytime - Construction noise (night-time) - Interior temperature variations - Limited building access - Limited elevator access - Loss of Internet Service - Loss of power - No Domestic Water - No Hot Water - Off |
Project Work | NA / 3506 |
| 112 | Postponed | No | Construction Work | Noise Notice – Daytime | 2025-10-20 | 2025-10-20 | 6:00am | 2025-11-20 | 5:00 pm | William B Travis Building | 7th Floor Commissioners Room | 7th Floor Commissioners Room Renovation | Wingfield |
- Construction Dust - Construction noise daytime - impactConstructionNoiseNight - impactLimitedBuildingAccess |
Tenant Remodeling | 993474 / 993474 |
| 92 | Rescheduled | yes | Shutdown | Fire Alarm Testing | 2025-10-10 | 2025-10-10 | 9:00 AM | 2025-10-10 | 10:00 am | Tom C Clark Building | 7th floor room 738 | Fire Suppression Annual Inspection | Barrientos |
- impactOther |
Life Safety | NA / NA |
| 48 | Rescheduled | yes | Maintenance Services | Elevators | 2025-10-10 | 2025-10-10 | 7:00 am | 2025-10-10 | 4:00 pm | Texas School for the Deaf | Elevators | Annual Elevator Inspections | Wooley |
- Limited elevator access |
Other | N/A / N/A |
| 39 | Rescheduled | yes | Maintenance Services | Elevators | 2025-10-22 | 2025-10-22 | 8:00 am | 2025-10-22 | 9:00 | Human Services Warehouse | Elevators | Annual Elevator Inspections | Wooley |
- Limited elevator access |
Other | N/A / N/A |
| Postponed | Rescheduled | Scheduled |